Guard House Security Manager Mr. Rahim 019-3055577 / Security Supervisor Mr. Ah Peng 011-21123534
Access Card reader being replaced .
The older unit was struck by lightning and was unable to be repaired.
Aug '25
Cost of new card reader : RM 2,900.00
Labour Cost : Absorbed by Service Provider, Esaki S/B
Damaged drains being replaced by MBPJ at the end of Jalan 7/4A & 7/4B
Replacement of some damaged drains
along Jalan 7/3 will commence soon.
Aug '25
Reported to MBPJ by Gerard Philips
(Ara Comm Chairman)
Jalan 7/3A , Rubbish discarded by Shops & Night vendors.
MBPJ reprimanded shop owners .
Aug '25
Reported to MBPJ by Mr. Kiri
(Ara Comm)
Lorong between Jalan Ara 7/2C & 7/2D, Potholes repaired by MBPJ
Aug '25
Reported to MBPJ by Mr. Kiri
(Ara Comm)
Jalan Ara 7/3E & 7/4G, Potholes repaired by MBPJ
(Pothole on Jln 7/3E reported by Resident Ms. Deb to GP)
Aug '25
Reported to MBPJ by Gerard Philips
(Ara Comm Chairman)
Children's Playground at Jalan Ara 7/5B.
Fyi, Playground cleanliness falls directly under MBPJ (The landscape dept.)
The team that you see sweeping leaves and cleaning the drains fall under a different team ( KDEB ; MBPJ's contractor) They don't maintain playground cleanliness 🤷
I've made a complaint to MBPJ regarding this and they have looked into it and taken action.
As for the playground amenities, MBPJ will be looking into cleaning up the items there. (Swing/slide, etc) A contractor is the the midst of being engaged by MBPJ to do this.
July '25
Reported to MBPJ by Gerard Philips
(Ara Comm. Chairman)
Children's Playground Spot lights faulty at Jalan Ara 7/5B.
Visuals of before and after repairs. The area is now lighted up brightly.
July '25
Reported to MBPJ by Gerard Philips
(Ara Comm. Chairman)
Replaced/repaired faulty lamps & flush system at Main Guardhouse.
July '25
Total Cost : Sponsored by En. Rahim
An initiative by Ara Comm.
& Our Security Provider Platinum 2
Repaired damaged Signage at Ara Entry Point.
July '25
Total Cost : Sponsored by En. Rahim
An initiative by Ara Comm.
& Our Security Provider Platinum 2
Barrier Gate Arm at Guardhouse (Post C) near Ara 7/5 damaged. Repaired both entry & exit arm.
July'25
Total Cost : Sponsored by En. Rahim
An initiative by Ara Comm.
& Our Security Provider Platinum 2
Guardhouse (Post C) near the Ara 7/5 being repaired. Rooftop leaking which damaged the interior walls. Replace rooftop/repair interior walls/ceiling/painting
July '25
Total Cost : Sponsored by En. Rahim
An initiative by Ara Comm.
& Our Security Provider Platinum 2
Barrier Gate Arm at Main Guardhouse damaged & repaired. (Saved RM600.00)
(Quotation received to replace Arm RM 600.00)
June'25
Materials Cost : Sponsored by Gerard Philips
Labour Cost : FOC - Repaired by Gerard Philips
(Ara Comm. Chairman)
No entry signage next to main Guardhouse was lying on the ground.
Cleaned up and installed back onto the pole with new holding brackets
June '25
Materials Cost : RM18.00
Labour Cost : FOC - Installed by Gerard Philips
(Ara Comm. Chairman)
Barrier gate Arm at Exit
Guardhouse damaged & repaired
(Saved RM600.00)
(Quotation received to replace Arm RM600.00)
June '25
Materials Cost : Sponsored by Gerard Philips
Labour Cost : FOC - Repaired by Gerard Philips
(Ara Comm. Chairman)
New Security SOP being enforced. We have 2 Security Personnel on duty compared to only 1 before this.
June '25
An initiative by your Ara Comm.
Installation of CCTV camera along main guardhouse railing to kick off new Security screening for Visitors starting June 1st 2025
(Refer to "New Security SOP" in Security page)
May '25
Materials Cost : RM82.70
Labour Cost : FOC - Installed by Gerard Philips
(Ara Comm. Chairman)
Visuals of area surrounding Our Children's playground along Jalan Ara 7/3 & 7/2. No contractor engaged to clear this area. Spoke to MBPJ and sorted this out. MBPJ will cut the grass in this area twice a month.
May '25
MBPJ clearing the area after a report was lodged.....
May '25
Reported to MBPJ by Gerard Philips
(Ara Comm. Chairman)
Trimming of Trees along Jln Ara SD 7/3
May '25
Reported to MBPJ by Gerard Philips
(Ara Comm. Chairman)
Clearing Up of Shed along Jalan Ara 7/3
April '25
An initiative by the Ara Comm.
& Our Security Service Provider Platinum 2
Total Cost : Sponsored by En. Rahim (P2)
Soil erosion on slope next to Jalan Ara 7/3.
Water flows down the slope when it rains causing major soil erosion on the slope as well as the surrounding trees. Tree roots can be seen.
Reported to MBPJ and action was taken after much persuasion by the Comm.
April '25
Reported to MBPJ by Gerard Philips
(Ara Comm. Chairman)
After Completion...
Visuals of work being done by MBPJ to repair the slope.
Attended by MBPJ in May '25
NO Entry sign ⛔ installed at Exit Guardhouse as Vehicles were trying to come in from the opposite direction.
April '25
Materials Cost : Sponsored by Gerard Philips
Labour Cost : FOC - Installed by Gerard Philips
(Ara Comm. Chairman)
Cleaning up of Main Guardhouse Before & After ✨
April '25
An initiative by Stephen Tey, Asok Raghavan & Gerard Philips
Items donated by Stephen Tey to be placed in Guardhouse,
Fridge
Cupboard
Radio player
Table/side table
Sun shade
March /April '25
CCTVS in the Exit Guardhouse (Post B) & the Guardhouse next to the tadika (Post C) were all not functioning and totally disabled.
Dismantled the faulty CCTV system, repaired, refurbished and managed to get it working again....
*Stephen donated a CCTV monitor and Gerard a CCTV DVR recorder.
March '25
An initiative by Stephen Tey & Gerard Philips
After Completion......🤗
Finally, we are being monitored & safe again......
*We saved RM7 K+ (Quotation received to repair & replace the system)
Materials Cost : Sponsored by Stephen Tey
& Gerard Philips
Labour Cost : FOC - Repaired/Refurbished
& Installed by Stephen Tey & Gerard Philips
Taman at ARA SD7/3 is nicely done up. New replacement by MBPJ.
Dear Ara Residents,
We are very excited to announce the launch of our new website.
(1) Safety cones - 10 numbers
(2) Vest blazers - 10 numbers
(3) Raincoats - 5 numbers
(4) LED Torch lights - 3 numbers
(5) CHOTA - 4 numbers
Thank you to BSDRA Security SubCommittee 2020/2021
Ragu Chairman
Alasri Secretary
Tan Choong Yee
Dr Jasmi Hafiz
Lee Kim Seong
Committee Members
Dear Fellow Ara Residents,
"Aduan" reports to be submitted to MBPJ
1. Potholes & Damaged Roads in ARA Sector
2. Playgrounds in ARA Sector
As promised, please find attached below 2 files on the above 2 reports on the status of our roads/potholes and the 3 Parks, which I shall submit to MBPJ for your kind reference. Kindly peruse and advise me if I may have missed out anything. I shall then call you and include if appropriate.
Warm regards.
SATU ARAH UNTUK ARA
Cheah
Chairman
27Jan2021.
MBPJ repairing SD7/5A
MBPJ repairing SD7/5A